Agenda item
Site of former Hastings College of Arts and Technology, Archery Road, St. Leonards on Sea
Minutes:
Proposal:
Variation of Conditions 3 (Approved Plans) and 34(Affordable housing) of Planning Permission HS/FA/15/00175 (As varied by HS/FA/17/00439) - Amendment for conversion of the listed terrace, into 12 units rather than 24 residential units, including minor external & internal alterations and reduction of affordable housing units from 56% to 25%.
Application No:
HS/FA/18/00291
Conservation Area:
Listed Building
Public Consultation
Yes - Burtons' St. Leonards
Grade II
9 letters of objection received and 1 neutral comment
received
The Principal Planning Officer, Mr Temple, presented this application for variation of Conditions 3 (Approved Plans) and 34(Affordable housing) of Permission HS/FA/15/00175 (As varied by HS/FA/17/00439) - Amendment for conversion of the listed terrace, into 12 units rather than 24 residential units, including minor external & internal alterations and reduction of affordable housing units from 56% to 25%.
Members were informed of several updates to the report:-
• Amended drawings 554_230 P3, 554_232 P5, 554_513 P3 and 554_521 P3 received following requirements of Conservation officer. These relate to external stair and railing of unit 8, garden wall detailing (Block K- listed building), section details of Block K, and an existing rear elevation of Block K respectively
• Tree Officer consultation response- No objection.
• “Deed of variation” to be removed from page 145. An S106 will now be submitted if the committee resolve to grant permission.
Mr Temple explained that the only physical changes were to Block K. Members were shown plans, photographs and elevations of the application site.
Councillor Davies sought clarification on the accessibility of the footpath. The Planning Services Manager said she would add an informative to advise that the footpath at the northern end of the site is not closed off and kept open.
Councillor Beaver proposed a motion to approve the application subject to an Informative. This was seconded by Councillor Davies.
RESOLVED – (unanimously) that the Planning Services Manager be authorised to issue planning permission upon completion of an agreement under S106 of the Town and Country Planning Act to secure:
· a financial contribution towards libraries (£28,667) and local public right of way improvements (£2616);
· a financial contribution towards local policing (£30,522.37)
· a financial contribution towards improving and upgrading local play facilities (£95,000);
unless it has been conclusively shown that the development would not be viable and it would still be acceptable in planning terms without the identified development contributions. In the event that the Agreement is not completed by 15th February 2019 that permission be refused on the grounds that the application does not comply with the relevant policies (policies H3, CI1 and CI3) of the Hastings Local Plan, The Hastings Planning Strategy 2011-2028 or the Hastings Local Plan, Development Management Plan unless an extension of time has been agreed in writing by the Planning Services Manager in consultation with the Chair and Vice Chair of the Planning Committee.
Subject to the above, Grant Full Planning Permission subject to the following conditions:-
1.
The development hereby permitted shall be begun before the expiration of three years from 22 November 2016.
2.
With the exception of internal works the building works required to carry out the development allowed by this permission must only be carried out within the following times:-
08.00 - 18.00 Monday to Friday
08.00 - 13.00 on Saturdays
No working on Sundays or Public Holidays.
3.
The development hereby permitted shall be carried out in accordance with the following approved plans:
554/001 P2, 554/002 P3, 554/004 P9, 554/005 P9, 554/006 P9, 554/009 P7, 554/009 P9, 554/012 P6, 554/014 P2, 554/501 P1, 554/502 P3, 554/503 P2, 554/504 P3, 554/505 P2, 554/506 P2, 554/507 P2, 554/508 P3, 554/509 P1, 554/510 P2, 554/511 P2, 554/512 P2, 554/513 P3, 554/514 P2, 554/515 P1, 554/516 P2, 554/517 P1, 554/518 P1, 554/519 P2, 554/520 P2, 554/521 P3, 554/522 P2, 554/523 P2, 554/524 P3, 554/203 P1, 554/204 P1, 554/205 P1, 554/206 P1, 554/207 P1, 554/208 P1, 554/209 P1, 554/210 P1, 554/211 P1, 554/212 P1, 554/213 P1, 554/214 P1, 554/215 P1, 554/216 P2, 554/217 P1, 554/218 P2, 554/221 P1 554/222 P1, 554/225 P1, 554/226 P3, 554/227 P1, 554/228 P1, 554/229 P2, 554/230 P3, 554/231 P1, 554/232 P5, 554/233 P1, 554/234 P1, 554/235 P1, 554/240 P1 together with all submitted documentation relating to the contents of these plans.
4.
The development shall be carried out in accordance with the approved details of brick approved by HS/CD/17/00164.
No further work shall take place regarding the external elevations of all visible external elevations and boundary walls until sample boards, measuring 1.5m x 1.5m of all materials to be used on all visible external elevations and boundary walls of the new development shall be submitted to and approved in writing by the Local Planning Authority. Where relating to brick and stone sample panels, such details shall show the bond pattern and mortar pointing. The development shall be carried out in accordance with the approved details.
5.
Notwithstanding the details shown on the submitted plans and having regard to Condition 4, the sample panels in respect of the brick elevations to Blocks A and B shall include details of the brick bond, window dressings and string courses formed either by brick or stone to match copings.
6.
Development shall be undertaken in accordance with the details of the bridge from the northern end of the site to the podium, approved under planning reference HS/CD/17/00448. These included elevations and sections showing details of the construction of the walkway, balusters and balustrades, privacy screens and supports including samples of materials and details of finishes.
7.
No development shall take place until the following details under criterions 7i, j, m, and p listed below have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.
Development in relation to criterions 7 a, b, c, d, e, f, g, h, k, l, n ,o, q, r shall be undertaken in accordance with the details approved under HS/CD/17/00448 and HS/CD/17/ 00662 as relevant, and shall be maintained thereafter in accordance with those approved details.
· windows and door type variations for the proposed new development (including bin stores and garage doors), to include the manufacturers details, size, appearance, materials and finishes proposed, without trickle vents or detailing concealed trickle vents plus 1:10 elevation drawings and 1:2 or full size horizontal and vertical cross-sections through each type;
a. roof profiles, colour and finish, plus details of the abutment to the main roof slopes, 1:10 plans and 1:2 or full size section details to be provided.
b. roof mounted plant, to include details of all solar panels and photo voltaic installations proposed on visible roof slopes. Details to include information on the size and proposed location of the array, the size of each panel, its appearance, materials, finish, plus full details of any supporting framework required.
c. dormers (Block K) and other roof extensions, to include 1:10 front, side and roof elevations, plus 1:2 or full size horizontal and vertical cross-sections.
d. rainwater goods, to include proposed locations, sizes profiles, material and finishes.
e. visible external flues and extract vents, to include proposed locations, sizes, appearance, materials and finishes.
f. louvered panels including the profile, size, materials and finish, 1:10 elevation details and 1:2 or full size horizontal and vertical sections to be provided.
g. balconies on the new buildings, to include full details of the frameless glazing (glass type/colour/reflective qualities), any top rail or vertical support, fixings for the railing and the proposed materials, profile and finishes to all balcony floors. Details to be provided as 1:10 elevations and 1:2 or full size sections.
h. in respect of Block K full details of all new and replacement windows and external doors. Elevations shall be provided for each item at a scale of 1:10, with full size or 1:2 scale horizontal and vertical sections. Full details of all proposed door and window furniture should also be provided. Window details shall include sections through cills, heads, frames, meeting rails and opening lights, glazing bars and mullions. Doors shall include sections through fanlights, top rails, mid rail, bottom rail, panel details and frame. All new doors and windows on the listed buildings shall match an existing original example profile as agreed with the local planning authority.
i. in respect of Block K only, full constructional details of the proposed new rear elevation canopy and balcony, to include 1:20 elevations and roof plan, plus full size or 1:2 scale cross-sections through the canopy, and details of the materials, finishes and proposed fixing to the building. Detailed drawings shall show elevations and sections through the canopy profile, canopy ribs/supports, the railing profile and the balcony construction.
j. in respect of Block K full constructional details of the new rear staircase atrium. To include the proposed fixing in to the original fabric of the listed buildings, plus elevations and roof plans at 1:20 and 1:2 or full size sections through the new construction (to include profiles through the proposed brise soleil, steps and handrails), and a full palette of materials to be used in the construction (roof, walls, floors and staircase).
k. in respect of Block K full details of proposals for the area below the retained Victorian infill, to the rear of the main entrance area, at basement level. Details shall be provided of all structural proposals, making good works and of any new doors, windows or other new construction proposed.
l. in respect of Block K full details of the proposed new front wall railings and gates to include the siting, size, appearance, materials and finishes and the proposed method of fixing. Details shall include 1:10 elevation drawings and 1:2 or full size cross-sections through the top rail, baluster profile, queen post profile, rear support bracket profile and a full size detail of all proposed finial types.
m. in respect of Block K full details of the new porticos to be reinstated to the front elevation of the terrace. To include 1:10 front, side and roof elevations and sections, plus 1:2 or full size sections through the render mouldings. Full details shall also be provided of all the materials and finishes proposed.
n. in respect of Block K full details of the new external staircase to the front area to Apt. 1, to include elevation and plan drawings at 1:10 and the step profile and handrail profile at 1:2 or full size, plus details of materials and finishes proposed;
o. in respect of Block K full details of any proposed new hanging lanterns to the front elevation of the terrace. To include 1:10 elevations and sections, plus details of their fixing to the building and the materials and finishes for the lanterns.
p. a methodology statement to be submitted and approved in writing by the local planning authority for the refurbishment of the existing lanterns which are to be rehung in a location to be agreed with the local planning authority. The methodology to include repairs to cast iron lantern and associated brackets, details of proposed replacement glass, fixing details into the masonry substrate and details of the luminaire to be inserted;
(i) existing hanging lanterns to be carefully recorded by way of drawings which will form the template of the proposed and the details are to be submitted in the form of 1:10 plans, elevations and sections, plus details of their fixing to the building and materials and finishes.
(ii) the locations of the new hanging lanterns to be agreed with the local planning authority.
(iii) in respect of Block K full details of the proposals in relation to the area of original party/garden wall that is to be retained to the rear garden area of the listed buildings. These are to include a methodology statement for the following:
q. Any areas of existing wall to be taken down;
(i) Reconstruction of wall including full specification for the works;
(ii) Specification for reconsolidation of existing parts of the wall to be retainedThe methodology statement should include all means of temporary supports to facilitate the works and be accompanied by a detailed drawing showing the extent of each element of works. Should new materials be required, a sample panel showing the proposed materials, width of mortar joint and finish of joint be constructed on site for approval and thereafter maintained on site until completion of the works.
(iii) in respect of Block K full details of all new surface treatments to yard and garden areas, where immediately abutting the listed buildings
8.
Development shall be undertaken in accordance with the details approved under HS/CD/17/00164 in relation to the measures outlined in the submitted ecological statements and reports Updated Extended Phase 1 Habitat Survey, Updated Badger Survey and Bat Survey, by PJC Ecology, dated March 2013, unless:
r. the programme for such measures is otherwise specified within that document (for example with regard to measures related to monitoring, further survey work, the erection of bird boxes on buildings or other conservation enhancements), in which case the works shall be carried out in accordance with the timescales contained therein or;
(i) unless the scheme(s), or programme(s) of measures contained within the ecological statements and reports is otherwise first varied, by way of prior written approval from the Local Planning Authority.
9.
Development should be undertaken in accordance with the details approved under HS/CD/17/00164 in relation to the Wildlife Protection Plan for Construction. The plan includes:
(ii) An appropriate scale plan showing 'wildlife protection zones' where all construction activities are restricted and where protective measures will be installed or implemented.
(i) Details of wildlife features of importance such as ancient woodland, Sites of Nature Conservation Importance and protected species.
(ii) Details of protective measures (both physical measures and sensitive working practices) to avoid impacts during construction. These to include measures such as the covering of trenches and manholes, during construction; the safeguarding of badgers setts, runs and foraging area, especially relating to the throughput of construction and other vehicular traffic, timing of operational activities; the erection of protective fencing at agreed distances from sensitive habitats and wildlife areas.
(iii) A timetable to show phasing of construction activities to avoid periods of the year when sensitive wildlife could be harmed, such as the bird nesting season and other wildlife breeding seasons.
(iv) Persons responsible for:
(v) Compliance with legal consents relating to nature conservation;
(a) Compliance with planning conditions relating to nature conservation;
(b) Installation of physical protection measures during construction;
(c) Regular inspection and maintenance of physical protection measures and monitoring of working practices during construction;
(d) Provision of training and information about the importance of 'wildlife protection zones' to all personnel on site.
(e) Species monitoring in accordance with condition 19 below. This list to be updated whenever necessary to keep the contact list current.
All construction activities shall be implemented in accordance with the approved details and timing of the plan unless otherwise approved in writing by the Local Planning Authority.
10.
No development shall take place until fencing and warning signs have been erected in accordance with the approved 'Wildlife Protection Plan for Construction' submitted and discharged in accordance with condition 9. All fencing and warning signs will be maintained in accordance with the plan, unless otherwise approved in writing by the Local Planning Authority.
11.
A scheme of surveying and monitoring all important and protected species found on site to show the effects of the scheme during construction and for a period of ten years after the last house has been occupied must be submitted in accordance with the details approved under HS/CD/17/00164. The scheme includes:
(f) A clear statement of the proposed aims and objectives of monitoring;
i) Details and justification for selection of baseline data and any changes or thresholds that, if occurring or reached, will trigger detailed remedial measures;
ii) Details of positive conservation targets along with any associated performance standards or success criteria that will indicate that targets have been reached;
iii) Details of the important and protected species and their places of shelter such as sett, hibernation sites, that are to be monitored;
iv) Methods for sampling and analysing, including the timetable and location for field survey;
v) Details of any legally required licences obtained from statutory agencies for the duration of the period of the construction and any changes to those licences which may be necessary during and post construction;
vi) Submission of a report on the monitoring to the local planning authority at intervals to be agreed after the commencement of construction works, or as otherwise approved in writing by the local planning authority, including a report on actual or anticipated changes in communities or populations, the reasons for the changes and any remedial measures considered to be necessary to modify the changes;
vii) Procedures to be put in place to enable the monitoring reports to be considered by the local planning authority in consultation with the developer. Should the local planning authority consider that remedial measures are necessary as a result of considering the monitoring report and any consultation responses under the above clause they shall give written notice to the developers. Within one month of receiving such written notice from the local planning authority the developers shall submit a scheme of remedial measures which shall include (but should not be limited to) the further mitigation and/or changes to any approved mitigation schemes and /or changes to working practices and programme of implementation for the approval of the local planning authority. The approved remedial measures shall be implemented in accordance with the approved scheme and programme unless otherwise approved in writing by the local planning authority.
12.
The hard landscape works shall be carried out as approved by HS/CD/17/00662. These details include proposed finished levels or contours; means of enclosure; car parking layouts; other vehicle and pedestrian access and circulation areas; hard surfacing materials; minor artefacts and structures (eg furniture, play equipment, refuse or other storage units, signs lighting etc.); proposed and existing functional services above and below ground (eg drainage, power, communications cables, pipelines etc. indicating lines, manholes, supports etc.); retained historic landscape features and proposals for restoration.
13.
All hard landscape works shall be carried out in accordance with the details approved by HS/CD/17/00662. The works shall be carried out prior to the occupation of any part of the development or in accordance with the programme agreed with the Local Planning Authority.
14.
All boundary fences, walls and enclosures shall be erected in compliance with approved details in HS/CD/17/00662. All such boundary fences, walls and enclosures shall be erected before the building to which they relate are occupied.
15.
Development shall be undertaken in accordance with the scheme of soft landscaping approved under reference HS/CD/17/00164, which includes indications of all existing trees and hedgerows on the land including details of those to be retained, together with measures for their protection in the course of development. New soft landscaping details shall include planting plans; written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers/densities where appropriate together with an implementation programme.
All planting seeding or turfing comprised in the approved soft landscaping scheme shall be carried out prior to the occupation of any part of the development, or with the written agreement of the Local Planning Authority, in the first planting and seeding seasons following the occupation of any buildings or the completion of the development, whichever is the sooner. Any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.
16.
Temporary protective fences to safeguard the trees and/or hedges to be retained on the site shall be erected in accordance with details approved under HS/CD/17/00164 and the current BSI 5837 standards. All such fences shall be kept in a sound, upright and complete condition until the development has been completed and/or the Local Planning Authority confirm in writing that the works have been sufficiently completed for the fencing to be removed.
17.
Demolition and development on site shall be undertaken in accordance with the Construction Management Plan approved under HS/CD/17/00448. This sets out mitigation measures to protect against disruption caused during demolition and construction and Includes:
viii) Parking for vehicles of site personnel, operatives and visitors;
a) loading and unloading of plant and materials;
b) storage of plant and materials
c) programme of works (including measures for traffic management)
d) Proposed methods of excavation, demolition, piling and all other construction associated with the development;
e) Noise and vibration monitoring arrangements for any piling that may be undertaken;
f) Methods of controlling dust emissions from the site
g) Details of wheel washing facilities and equipment to be provided during periods of demolition, excavations, earthworks and construction to be provided within the site to prevent the carrying and deposition of mud, dust or other debris on their wheels and to prevent contamination and damage to adjacent roads.
18.
Demolition and commencement of development shall be undertaken in accordance with the measures in the approved Traffic Management Scheme (HS/FA/17/00662).
19.
(i) Detailed site investigation for the presence of contaminants, methane and carbon dioxide in soil shall be shall be undertaken in accordance with the details approved under HS/CD/17/00662 prior to the commencement of construction works on site. Such investigation and assessment should be carried out by suitably qualified personnel in accordance with current Government, Environment Agency and British Standard Guidance. Should any significant risks be identified by such an investigation, a remediation scheme including suitable monitoring and verification methodologies shall be agreed in writing by the Local Planning Authority.
(ii) The remediation scheme, as agreed by the Local Planning Authority, shall be fully implemented before the development is first occupied. Any variation to the scheme shall be agreed in writing with the Local Planning Authority in advance of works being undertaken. The remediation scheme is to include considerations and proposals to deal with situations where, during works on site, contamination is encountered which has not previously been identified. Any further contamination shall be fully assessed and an appropriate remediation scheme submitted to the Local Planning Authority for written approval. On completion of the works the developer shall provide written confirmation that all works were completed in accordance with the agreed details.
20.
The new estate roads shall be designed and constructed to a standard approved by the Planning Authority in accordance with Highway Authority's standards with a view to their subsequent adoption as publicly maintained highway.
21.
No development shall take place within the application site until the applicant or their agents or successors in title, has secured the implementation of a programme of archaeological work in accordance with the written scheme of investigation approved under HS/CD/17/00164.
22.
The development shall take place in accordance with the on-site watching brief approved by HS/CD/17/00164. In the event of important archaeological features or remains being discovered which are beyond the scope of the watching brief to excavate and record and which require a fuller excavation, then construction work shall cease until the applicant has secured the implementation of a programme of archaeological work in accordance with a revised written scheme of investigation which has been submitted to and approved in writing by the Local Planning Authority.
23.
There shall be no obstruction to visibility in either direction onto Archery Road within splays of 2.4 X 43 metres at the junction with the access roads into the development
24.
The development shall not be occupied until parking areas have been provided in accordance with the approved plans and the areas shall thereafter be retained for that use and shall not be used other that for the parking of vehicles.
25.
Construction of the development shall be undertaken in accordance with details of the proposed means of foul sewerage and surface water disposal/management approved under reference HS/CD/17/00164.
26.
Development shall be carried out in accordance with the details approved under condition 25 and no occupation of any of the dwellings or flats hereby approved shall occur until those works have been completed.
27.
No occupation of any of the dwellings or flats hereby approved shall occur until the Local Planning Authority has confirmed in writing that it is satisfied, that the necessary drainage infrastructure capacity is now available to adequately service the development.
28.
No dwelling hereby approved shall be occupied until readily accessible storage space for refuse bins awaiting collection have been provided to the satisfaction of the Local Planning Authority.
29.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (as amended by the Town and Country Planning (General Permitted Development) (Amendment) (No.2) (England) Order 2008 (or any Order revoking or re-enacting or amending that Order with or without modification), the garages hereby approved shall be kept available for the parking of motor vehicles at all times.
30.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (as amended by the Town and Country Planning (General Permitted Development) (Amendment) (No.2) (England) Order 2008 (or any Order revoking or re-enacting or amending those Orders with or without modification), no development within Part 1, Classes A-G shall take place on the dwelling houses hereby permitted or within their curtilage.
31.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (as amended by the Town and Country Planning (General Permitted Development) (Amendment) (No.2) (England) Order 2008 (or any Order revoking or re-enacting or amending that Order with or without modification), no television, radio aerial, satellite dish or other form of antenna shall be affixed on the exterior of any building forming part of the development hereby permitted.
32.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (as amended by the Town and Country Planning (General Permitted Development) (Amendment) (No.2) (England) Order 2008 (or any Order revoking or re-enacting or amending that Order with or without modification), no windows, doors or other form of openings other than those shown on the approved plans, shall be inserted in the flank elevations of Blocks C, D, F, G, H, L, M of the development hereby permitted.
33.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any Order revoking or re-enacting or amending that Order with or without modification), no gates, fences, walls or other means of enclosure, other than those shown on the approved plans, shall be erected or placed forward of the principal wall of the dwellings forming Blocks C and F.
34.
The development shall not begin until a scheme for the provision of affordable housing as part of the development has been submitted to and approved in writing by the Local Planning Authority. The affordable housing shall be provided in accordance with the approved scheme and shall meet the definition of affordable housing in Annex 2 of the National Planning Policy Framework or any future guidance that replaces it. The scheme shall include:
(i) the numbers, type, tenure and location on the site of the affordable housing provision to be made, which shall consist of not less than 25% of housing units which equates to 28 housing units.
(ii) the timing of the construction of the affordable housing and its phasing in relation to the occupancy of the market housing. The phasing of occupancy within the scheme for the provision of affordable housing shall include a requirement that no more than 50% occupancy of the market housing shall be allowed until 100% of the affordable housing units have been constructed.
(iii) the arrangements for the transfer of the affordable housing to an affordable housing provider [or the management of the affordable housing] (if no RSL involved);
(iv) the arrangements to ensure that such provision is affordable for both first and subsequent occupiers of the affordable housing; and
(v) a signed nomination agreement setting out the Council’s rights to nominate from its housing register (or another list that the Council is required to keep for the discharge of its housing responsibilities) a new tenant or tenants in respect of three of every four Dwellings which become true voids.
(vi) the occupancy criteria to be used for determining the identity of occupiers of the affordable housing and the means by which such occupancy criteria shall be enforced.
(vii) details of the notice given to the Council when a vacancy of an affordable unit becomes available and when a vacancy has been filled.
(viii) details of liability connected with the exercise of Nomination Rights, which shall require that the loss of rent, Service Charge, for any legal or other costs or fees or any other expenses incurred by the Housing Association arising from the exercise of the Nomination Rights shall remain with, be covered by and be the responsibility of the Housing Association.
Reasons:
1.
This Condition is imposed in accordance with the provisions of Section 91 of the Town and Country Planning Act 1990.
2.
To safeguard the amenity of adjoining and future residents. (Hastings Local Plan 2004 Policies DG1 and DG3).
3.
For the avoidance of doubt and in the interests of proper planning.
4.
In the interests of the character and amenity of the St. Leonards West Conservation Area.
5.
In the interests of the character and amenity of the St. Leonards West Conservation Area.
6.
To ensure a satisfactory form of development and in the interests if the character and amenity of the St. Leonards West Conservation Area.
7.
In the interests of the character and amenity of the St. Leonards West Conservation Area.
8.
To protect features of recognised nature conservation importance. (Hastings Local Plan 2004 Policies NC8 and NC9.)
9.
To protect features of recognised nature conservation importance. (Hastings Local Plan 2004 policies NC8 and NC9.)
10.
To protect features of recognised nature conservation importance. (Hastings Local Plan 2004 policies NC8 and NC9.)
11.
To protect features of recognised nature conservations importance. (Hastings Local Plan 2004 policies NC8 and NC9.)
12.
In the interests of the character and amenity of the St. Leonards West Conservation Area.
13.
In the interests of the character and amenity of the St. Leonards West Conservation Area.
14.
In the interests of the character and amenity of the St. Leonards Conservation Area.
15.
In the interest of the character and amenity of the St. Leonards West Conservation Area.
16.
In the interest of the character and amenity of the St. Leonards West Conservation Area.
17.
In the interest of the character and amenity of the St. Leonards West Conservation Area.
18.
In the interests of the amenity of the neighbouring residential occupiers. (Hastings Local Plan 2004 Policy DG1).
19.
In the interests of highway safety and for the benefit and convenience of the public at large.
20.
To protect those redeveloping the site and any future occupants from potential landfill gases and soil contamination.
21.
In the interest of public safety.
22.
In view of the position of the site in an area of archaeological interest. In accordance with the aims of Policy C6 in the Hastings Local Plan 2004.
23.
In view of the position of the site in an area of archaeological interest. In accordance with the aims of Policy C6 in the Hastings Local Plan 2004.
24.
To ensure that an acceptable standard of access is provided in the interests of pedestrians safety.
25.
To prevent flooding
26.
To ensure a satisfactory form of development in the interests of the character and amenity of the area.
27.
To ensure a satisfactory form of development in the interests of the character and amenity of the area.
28.
To ensure the deliver of sustainable development in accordance with the interests of the NPPF and emerging Policy EC4 of the Development Managing Plan.
29.
To ensure the deliver of sustainable development in accordance with the interests of the NPPF and emerging Policy EC4 of the Development Managing Plan.
30.
To ensure the deliver of sustainable development in accordance with the interests of the NPPF and emerging Policy EC4 of the Development Managing Plan.
31.
In the interests of the character and amenity of the St. Leonards West Conservation Area.
32.
In the interests of the character and amenity of the St. Leonards West Conservation Area.
33.
In the interest of the character and amenity of the St. Leonards West Conservation Area.
34.
To ensure that the proposal provides an appropriate level of affordable housing provision within the development and to meet the requirements of Policies H3 and CI1 of the Hastings Planning Strategy Local Plan (2014).
Notes to the Applicant
1.
Failure to comply with any condition imposed on this permission may result in enforcement action without further warning.
2.
Statement of positive engagement: In dealing with this application Hastings Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the National Planning Policy Framework.
3.
There may be badgers on the site and your attention is drawn to the provisions of the Badger Protection Act 1992. It is a criminal offence to kill or injure a badger; to damage or obstruct access to its sett; or to disturb a badger when it is occupying a sett.
4.
This permission is the subject of a legal agreement, agreed by application HS/FA/15/00175 as per the agreed deed for variation and a new legal agreement as part of of this consent under S106 of the Town and Country Planning Act 1990 (as amended).
5.
It will be necessary to enter into a Section 38 Agreement for the adoption of the roads before works commence.
6.
Due to the nature of the highway in the vicinity of the site, construction traffic could damage the carriageway/verges. The highway authority will require the applicant to reimburse their legitimate expenses in making good any such damage. Prior to the commencement of development the applicant should contact East Sussex highways 0345 60 80 193 to arrange a photographic survey and joint inspection of the local highway network.
7.
The developer should enter into a formal agreement with southern Water to provide necessary sewerage infrastructure required to service this development. Please contact Atkins Ltd, Anglo st James House, 39A Southgate Street, Winchester, SO23 9EH (Tel 01962 858688) or
www.southernwater.co.uk
8.
A formal application to requisition water infrastructure is required in order to service this development. Please contact Atkins Ltd, Anglo St James House, 39A Southgate Street, Winchester, SO23 9EH (Tel 01962 858688) or www.southernwater.co.uk
9.
Consideration should be given to the provision of domestic sprinkler systems within the properties.
10.
The applicant is advised that the UPVC windows within the development shall be of a slim line form that responds positively to the character and appearance of the conservation area.
11.
The applicant is reminded of their obligations in respect of the Combined Geotechnical and Ground Contamination Risk Assessment (Ashdown Site Investigation Limited, October 2015) and the identified measures in relation to land stability in undertaking these works.
12.
Conditions imposed on permissions HS/FA/15/00175 and HS/FA/17/00439 must still be complied with during and after development.
13. It is advised that the footpath at the northern end of the site should be retained and remain open at all times.
Supporting documents:
- MAP_Site of former Hastings College Archery Road - HS_FA_18_00291_, item 76c PDF 467 KB
- Site of Former Hastings College of Arts and Technology, Archery Road - HS-FA-18-00291, item 76c PDF 184 KB
-
My council
Contact
Got a question about democratic services?
Content
The content on this page is the responsibility of our Democratic Services team.