Agenda item
Shearbarn Holiday Park, Barley Lane, Hastings
Minutes:
Proposal:
Change of use of private syndicate fishing lake to amenity land in association with Shearbarn Holiday Park and including public fishing. Construction of footpath.(Retrospective)
Application No:
HS/FA/15/01030
Existing Use:
Caravan park
Public Consultation:
10 letters of objection received
Mrs Meppem, Assistant Plannerupdated the Committee on an amendment to informative number. 4 to read:
The applicant is advised that formal planning permission would be required for any additional structures or earth works on site, including maintenance sheds, fishing shelters etc. and any reinforcement works to the lake edge to create fishing platforms. Prior to submitting an application pre-application advice should be sought from the Local Planning Authority to ascertain the likelihood of such a proposal being considered acceptable
Additional representations had also been received since the agenda had been published. These were circulated to members of the committee.
Councillor Cooke proposed approval of the recommendations set out in the resolution below. This was seconded by Councillor Edwards.
RESOLVED - (unanimously) that full planning permission be granted subject to the following conditions:
1.
Within six months of the date of this permission the following details shall be submitted to and approved in writing by the Local Planning Authority
· Details of the boundary treatment along the border of the site with the Country Park
· Details of the fence denoting the edge of the footpath hereby approved
· Details of the information boards to be installed along the footpath and around the wider site
All such boundary treatment and information boards shall be erected within a time scale agreed by the Local Planning Authority and maintained to an acceptable level thereafter.
2.
The works hereby approved shall be carried out in accordance with the recommendations within the Preliminary Ecology Appraisal dated 11.05.2016 produced by The Ecology Consultancy.
3.
Within six months of the date of this permission details shall be submitted to and approved in writing by the Council of the measures to enhance and improve the biodiversity within the reservoir in accordance with the recommendations within the Preliminary Ecology Appraisal produced by The Ecology Consultancy. The development shall then be carried out in accordance with the approved details.
4.
At no time shall any lighting, permanent or temporary, be installed along the footpath hereby approved
5.
The track way hereby approved shall be for pedestrian access only except in emergency situations or for maintenance purposes.
6.
The development hereby permitted shall be carried out in accordance with the following approved plans and details: 37221000B, 37221002B and the preliminary ecology appraisal produced by The Ecology Consultancy date 11.05.2016.
Reasons:
1.
In the interests of the safety and protection of flora and fauna on the site.
2.
To ensure the works are carried out in accordance with Best Environmental Practice.
3.
To protect and enhance the biodiversity and ecological features of the site.
4.
In the interests of the safety and wellbeing of bats and other wildlife on the site.
5.
In the interests of the safety and protection of flora and fauna on the site.
6.
For the avoidance of doubt and in the interests of proper planning.
Notes to the Applicant
1.
Failure to comply with any condition imposed on this permission may result in enforcement action without further warning.
2.
Statement of positive engagement: In dealing with this application Hastings Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the National Planning Policy Framework.
3.
A separate application, to be submitted in accordance with the Advertisement Regulations, may be required for the display of the information boards, which cannot be approved as part of this permission.
4.
The applicant is advised that formal planning permission would be required for any additional structures or earth works on site, including maintenance sheds, fishing shelters etc. and any reinforcement works to the lake edge to create fishing platforms. Prior to submitting an application pre-application should be sought from the Local Planning Authority to ascertain the likelihood of such a proposal being considered acceptable.
Supporting documents:
- MAP_HS_FA_15_01030_Shearbarn Holiday Park, item 110a PDF 314 KB
- HS-FA-15-01030 Shearbarn Holiday Park, Barley Lane, item 110a PDF 118 KB
-
My council
Contact
Contact us if you have a question about democratic services.
Content
The content on this page is the responsibility of our Democratic Services team.